The contractors initial work
The contractors agent will probably come to site with a small nucleus of permanent employees, and his main aim will be […]
The contractors agent will probably come to site with a small nucleus of permanent employees, and his main aim will be […]
Many civil engineering contractors now use sub-contractors to do much of their work. Most conditions of contract permit a contractor to
A correspondence filing system of the type outlined below is needed. General files (Series 19) 1. Employer (including copies of
The CDM Regulations require that a Health and Safety Plan be developed pre-tender and then continued and modified in the construction
The Health and Safety Plan required under CDM Regulations Read Post »
Under the ICE conditions the engineer has a duty to provide the contractor with the drawings and further instructions needed to
The engineers duty to provide all necessary drawings to the contractor Read Post »
The purpose of the Health and Safety File is to provide clients, and those who may do work for them in
The Health and Safety File required under CDM Regulations Read Post »
The ICE conditions permit the engineer to appoint an Engineers Representative on site, commonly termed the resident engineer to watch and
The engineers representative on site the resident engineer Read Post »
The contractors monthly application for interim payment is usually set out as shown in Fig. 13.4. Initially only the items under
The Construction (Design and Management) Regulations 1994 (SI 1994/3140) known generally as the CDM Regulations came into full effect on
The Construction (Design and Management) Regulations 1994 Read Post »