Inspection of Concrete Placement
Concrete should be inspected for the owner before, during, and after casting. Before concrete is placed, the formwork must be free […]
Concrete should be inspected for the owner before, during, and after casting. Before concrete is placed, the formwork must be free […]
Most manufacturers and trade associations make available instructions and specifications for installation and maintenance of their floorings. The most important requirement
Metal inserts of various types are cast into concrete floor slabs to serve as hangers or connectors for other parts of
Instrumental method is the main SMZ method. Exactly it urges to solve a problem of forming earthquake intensity forecast. At the
In recent years a new «instrumental-calculational» method of SMZ (per se simultaneously having the features of both instrumental and calculational method)
Instrumental-calculational method of seismic microzonation Read Post »
The geometry, material, level of natural ground line, soil type, seismic event, and upper level of bedrock constitute the required input
Tall buildings are subjected to heavy horizontal forces due to inertia during earthquake. Hence they need shear walls. A shear wall
Improving Earthquake Resistance of Tall Buildings Read Post »
(i) During the launching process the leading edge of the superstructure is subject to a large hogging moment. In this
In the method of stitching, it is a normal practice to construct the widening part of the bridge at first