Design-build projects present design and schedule challenges so PEOs shall coordinate the hydraulic design with both the RHE and State Hydraulics Office throughout the project. In addition to the guidance in the Hydraulics Manual and the Highway Runoff Manual, PEOs shall consult the Design-Build Manual.
Prior to the Request for Proposal phase of the project, a conceptual design hydraulic report(s) is prepared that serves as the basis of a bid and further development by the selected design-build contractor. Refer to the design-build Request for Proposal template for more information on required reporting.