8.1 Introduction to employer and his engineer
8.2 The role of the employers engineer under ICE conditions
8.3 A note on alternative provisions of the ECC conditions
8.4 Limitations to the engineers powers under ICE conditions
8.5 The engineers duty to provide all necessary drawings to the contractor
8.6 Quality assurance considerations References